Watch the New Nissan Stadium Rise in Time-Lapse Drone Video of Nashville’s $2.1B NFL Landmark
Nashville Drone Co time-lapse video of construction of the new Nissan Stadium
The skyline of Nashville is rapidly evolving, and one of the most exciting developments is the construction of the new Nissan Stadium. Many are asking the question “how is the progress on the new Nissan Stadium” coming along so Nashville Drone Co decided to reveal the time-lapse drone video project they have been working on since July 2024.
As the future home of the Tennessee Titans and a landmark project for Music City, this next-generation stadium has been under close watch by fans, city planners, and construction enthusiasts alike. In 2025, the progress is undeniable and thanks to stunning aerial footage captured by Nashville Drone Co, the journey from blueprint to build is now visible to all.
In this blog post, we’ll break down the latest construction updates, provide visual insights from exclusive drone footage, and explore what this project means for Nashville and the future of NFL stadium design.
A Vision Becoming Reality: The New Nissan Stadium
The New Nissan Stadium is more than just a replacement for the aging current facility. It’s a $2.1 billion commitment to building a state-of-the-art venue designed to host NFL games, concerts, major events, and community gatherings for decades to come.
This new stadium will feature:
A fully enclosed, weather-protected environment
Seating capacity estimated between 55,000 and 60,000
12,000 square feet of community space available year-round
Advanced sustainability measures and LEED certification goals
Enhanced fan experiences with improved sightlines, premium amenities, and modern design elements
Drone Time-Lapse Captures the Construction Journey
Over the past year, Nashville Drone Co has captured the progress of the construction site from the sky. Using high resolution drones, they’ve compiled a stunning time-lapse that documents the transformation of the site from early groundwork to towering steel structures.
This video reveals several key phases:
Site Preparation and Foundation Work: The early footage shows how crews cleared and prepped the site, pouring foundations and installing underground utilities.
Steel Framework Rising: Massive steel beams and trusses began forming the stadium’s skeleton throughout late 2024 and early 2025.
Approaching Roof Installation: As of mid-2025, the construction is nearing the point where the roof structure will be added a major milestone in the build process.
Each phase of development is visible in stunning detail, showing not only technical precision but also the scale and ambition behind this stadium.
Why Drone Footage Matters for Construction Transparency
Drone videography has become a powerful tool in modern construction documentation. For a project as large as the New Nissan Stadium, traditional updates and ground level photography can’t fully communicate the magnitude of the work being done.
Here’s why drone video adds unique value:
Bird’s-eye perspective: Offers a comprehensive view of the entire site layout
Progress tracking: Helps stakeholders, fans, and city officials track development in real time
Public engagement: Builds excitement and community involvement by offering regular visual updates
Historical documentation: Creates a lasting visual record of a landmark being built
For fans of architecture, engineering, and sports infrastructure, this kind of footage offers rare insight into the sheer complexity of modern stadium construction.
What’s Next for the New Nissan Stadium?
As we move into the latter half of 2025, construction crews are preparing for the next major chapter: the installation of the roof structure. This phase will define the visual identity of the stadium and mark the transition from a skeleton of steel to a recognizable venue.
Key milestones expected in late 2025 and early 2026 include:
Roof and facade assembly
Seating installation
Interior systems and infrastructure (electrical, HVAC, plumbing)
Technology systems including video boards, lighting, and sound
Landscaping and plaza development surrounding the stadium
The project remains on track to open in time for the 2027 NFL season, with a soft launch and test events likely to take place in 2026.
Economic and Cultural Impact on Nashville
Beyond its architectural and sports significance, the New Nissan Stadium is expected to have a lasting economic and cultural impact on the Nashville area.
Economic Growth:
The stadium is projected to generate billions in long-term economic activity. From construction jobs to event tourism, the ripple effects of this development will touch every part of the local economy. New businesses, hotels, and restaurants are expected to emerge in surrounding neighborhoods, spurring urban growth and revitalization.
Cultural Significance:
As the heart of the East Bank redevelopment, the stadium will act as a centerpiece in a broader effort to reshape the urban landscape. The project aligns with Nashville’s vision for becoming a major national destination for sports and entertainment.
It also reinforces the city’s identity as a place where music, community, and sports intersect. The design of the stadium incorporates spaces that can be used for festivals, local events, and year-round community engagement not just NFL Sundays.
Community Input and Public Transparency
Throughout the planning and early construction process, community feedback has played a key role. The city of Nashville, alongside the Titans organization and Metro Council, has hosted forums and provided updates to ensure transparency and maintain public trust.
This approach has included:
Public Q&A sessions with planners and city officials
Environmental impact assessments and mitigation planning
Budget transparency and cost-sharing strategies between the city, team, and state
As construction progresses, stakeholders continue to emphasize open communication, especially as the East Bank redevelopment brings more change to the region.
How to Stay Updated on the Stadium’s Progress
If you want to stay informed about the latest updates, drone videos are one of the most exciting ways to do it. Platforms like YouTube, Instagram, and TikTok have become popular outlets for sharing drone footage and construction news in real time.
Nashville Drone Co regularly publishes updates on their YouTube channel, providing month-by-month visual breakdowns of the progress. Subscribing to their channel is a great way to witness the transformation from start to finish.
In addition, the Tennessee Titans website and the Metro Nashville planning site publish official construction milestones, planning documents, and community announcements.
Final Thoughts
The New Nissan Stadium is shaping up to be one of the most innovative and community focused stadiums in the NFL. As we pass key construction phases in 2025, drone time-lapse footage gives us an unmatched look into the real-time progress of this massive project.
Whether you’re a Titans fan, a construction enthusiast, or just a proud Nashvillian, there’s something inspiring about watching a modern marvel rise from the ground up. With just under two years until opening day, the countdown is officially on.
Be sure to check out the full 2025 drone time-lapse video, and stay connected as Nashville builds its future one beam at a time.
Watch the Full Drone Time-Lapse Video
You can view the latest high-definition aerial footage of the New Nissan Stadium construction on Nashville Drone Co’s YouTube channel.
Contact Nashville Drone Co to book your construction progress videos. info@nashvilledrone.co